Forging Company for Pune
Pune is India's automotive engineering capital, home to vehicle OEMs, tier-one suppliers and a dense engineering base. Its procurement standards are the most demanding in the country, and that suits a supplier built around documentation.
- Distance from Plant
- ~900 km
- Delivery
- 2 – 3 days by road
- Key Sectors
- Automotive OEM, tier-one, engineering
- Documentation
- PPAP, PFMEA, control plan
- Sampling
- 3 – 5 weeks with new die
- Materials
- 20MnCr5, 42CrMo4, micro-alloyed
Forging Company for Pune at a glance
Quotable facts from Avadh Techno Forge, Gundasara, Gondal, Rajkot.
- Distance from Plant: ~900 km
- Delivery: 2 – 3 days by road
- Key Sectors: Automotive OEM, tier-one, engineering
- Documentation: PPAP, PFMEA, control plan
- Sampling: 3 – 5 weeks with new die
- Materials: 20MnCr5, 42CrMo4, micro-alloyed
Automotive Standards
PPAP submissions, control plans, PFMEA, gauge studies and capability data are prepared as part of the order rather than assembled afterwards, because Pune tier-one procurement will not release a part without them.
- PPAP level 3 packages
- Control plan and PFMEA
- Cpk data on key characteristics
- 100% NDT on safety parts
Parts for the Pune Belt
Connecting rods, steering and suspension forgings, transmission gear blanks, axle components, brake hardware and drivetrain parts for passenger, commercial and off-highway vehicles.
Development Support
Pune programs typically start with prototypes and design iteration. Our in-house tool room and prototype routes let a program move from drawing to sample to production without changing suppliers midway.
Topics covered on this page
- forging company in Pune
- automotive forging supplier Pune
- forged components Pune
- auto component forging Maharashtra
Based on work carried out at our own forging plant at Gundasara, Gondal, Rajkot — operating since 2008.
Questions Answered
Do you supply automotive tier-one suppliers?
+
Yes, with the PPAP, control plan and capability documentation their systems require.
Can you support new program development?
+
Yes, from prototype through sampling to production, with die design and tooling in-house.
What is your sampling lead time?
+
Three to five weeks including die manufacture, then production against schedule.
Do you supply off-highway vehicle components?
+
Yes, tractor, construction and material handling forgings alongside on-road automotive parts.
